A.

Project Scope.
Notes and Photos by Able Group Inc.

Outreach Fit-Up and Renovations, Planning Stages.


B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

Project Notes

Planning
Review
3/01/18:



 

Existing

 

Photo A.

Public Entrance.
Removal of Bilco Door.
Vestibule needed.

 

Photo B.

New Exterior Door and frame need with glass.

New Door to swing outside.

Studding and moisture resistant drywall.
  

Photo C.

All walls treated with Lock-Tite Coating.

Drain to remain in place.
Studding to be framed around it and moisture resistant drywall.

Photo D.

Lining for stair wall using sanitary FRP panels

1/8" thick.
Stair rail removed and framed in
.
Studding and moisture resistant drywall.
 

Photo E.

Storage area below the stairs.
Studding and moisture resistant drywall.
 

Column no changes.


 

Photo F.

Back wall Lock-Tite only.
This section to have up to five refrigeration units.

Photo G.

HVAC Split System located here.

Create custom built
"radiator enclosure".

Studding and moisture resistant drywall.
 
 

Photo H.

Demo all plumbing and sinks on the wall.
Lock-Tite treatment.
Studding and moisture resistant drywall.
 

Photo I.

Demo all existing ceilings.

New LED recessed lighting.

Photo J.

Antique sinks to be put on EBay for resale.

Photo K.

This area to remain as is.




 

Commercial Facility Services for Every Property Concern - Contact Able Group Inc.